Product name:manually operated emergency bottom shut off valves for tank truck
Description:
Manual bottom emergency valve is installed on the bottom of the
tanker, the top parts is tightly sealed inside the tanker. External
shear groove design limits product spillage when the tanker is
crashed down, it will automatically cut off itself via this groove
under the situation there’s no affectation on the sealing. This will
efficiently protect the over rolled tanker from leakage to ensure
the safety when transportation. This product is suitable for
water, diesel, gasoline and kerosene and other light fuel etc.
Quick Details
Place of Origin | FOSHAN, China (Mainland) |
Brand Name | MBPAP |
Model No. | HDV-80NS |
Standard or Nonstandard | Standard |
Structure | Shutoff |
Pressure | Low Pressure |
Power | Manual |
Material | Alloy |
Temperature of Media | Normal |
Media | Oil |
Port Size | 3"/4" |
Work pressure | 0.6MPa |
Seal | FKM |
Connect way | Flange |
Max flow rate | 2500L/min |
Specification:
Nominal diameter | 3",4" |
Working pressure | 0.6Mpa |
Open method | Manual |
Temperature range | minus 20-70℃ |
Material | Aluminum alloy |
Special surface treatment
The whole valve body is passed a special surface process to improve the anticorrosion.
Design and high lift poppet minimizes pressure drop to give maximum flow rate.
Meets the standard requirements to limit product spillage in the event of an
accident.
When need to emergency discharging, the pneumatic control is useless, it can be
opened by manual way.
The size of the valve is more smart, is suitable for the smaller space’s demand.
Easy servicing
Allows the air cylinder piston to be replaced without removing the valve from
the tank pipe work.
Fatigue and fall detection experiments:
packaging: carton, pallet & wooden case as per customer’s request.
Delivery time: within 15 days after payment
FAQ
Q1. What is your terms of packing?
A: Generally, goods are sealed in ploy bags and packed in cartons and pallet or wood cases.
Q2. What is your terms of payment?
A: T/T (deposit + balance before delivery). We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
A: Generally, it will take 25 to 60 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample for free charge if we have ready parts in stock, but the customers have to pay the courier cost.
Q7. How do you make our business long-term and good relationship?
A: We provide our clients with one-stop service, from specific component to final assembled products, solving various problem for different clients all over the world.
'+(data.list[i].ReviewScore==1||data.list[i].ReviewScore==2?"Bad reviews":data.list[i].ReviewScore==3||data.list[i].ReviewScore==4?"Middle review":"Good reviews")+'
'; _html+=' '+data.list[i].ReviewDateTime+'
'; _html+=' '; _html+=''+data.PageCtrlStr+'
');document.getElementById('mkCommentAll').className='appr-queue'; } if(ct==1){ $('#mkComment100').html(_html+''+data.PageCtrlStr+'
'); document.getElementById('mkComment100').className='appr-queue';} if(ct==2){ $('#mkComment50').html(_html+''+data.PageCtrlStr+'
'); document.getElementById('mkComment50').className='appr-queue';} if(ct==3){ $('#mkComment0').html(_html+''+data.PageCtrlStr+'
');document.getElementById('mkComment0').className='appr-queue'; } for(var i=0;i